Font Size: a A A

Research On Management And Performance Evaluation Of Tree Seedling Project In Shannxi Province

Posted on:2009-05-10Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhaoFull Text:PDF
GTID:2189360272965651Subject:Forestry
Abstract/Summary:PDF Full Text Request
All of the important social and economic activities are begun from projects. The measurable decision can accelerate the economic development. On the contrary, the immeasurable decision makes adverse action. According to the project evaluation, the measurable decision can be made. However, today's project evaluation can't work properly, because the system of project evaluation can't fit for the social and nature environment currently. So, it is necessary to study on it.The author user some gains of others and seniors for reference, also puts forward own self some new views in this thesis systems. After discussing the form mechanism of the tree seedling project performance, according to the principle to design an index system and the character of the tree seedling project, the paper sets up a practically and dynamic index system that integrates three dimensions, which is the key factors of the tree seedling project performances (cost, time, quality), the life cycle of the project and four aspects of the Balanced Scorecard. This index system improves the traditional system.As a conclusion, the author provides a new method to evaluate project on nowadays. In 21 century, the new method has a great meaning in practice.
Keywords/Search Tags:Tree Seedling Project, Performance Evaluation, Value Chain, Balanced Scorecard, Performance Evaluation Model
PDF Full Text Request
Related items