Study On The Management Alternative Improvement And Corresponding Countermeasures For The ANSTEEL-APA Engineering Project

Posted on:2012-01-04Degree:MasterType:Thesis
Country:ChinaCandidate:C WangFull Text:PDF
GTID:2211330368979767Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Automation Engineering industry belongs to the computer,electrical instrumentation expertise-based small business. Over the last decade, with the economic development of China, the number of automation engineering company is constantly increasing. In China's economic development, they play an increasingly important role. In automation industry, there is lack of management professionals and mature industry management theories .At the same time,It has no available theory to follow, so there are some problems in practice.In this paper, we research from the perspective of scientific management and the whole process of the actual project .and analyzes an actual status of the automation project management. In Shenyang Xin RiOu automation company, project design, procurement, production, on-site construction, scheduling, organization, commissioning and acceptance phases are analyzed. We point out that the most influential stages of completion of the project is organizational structure and personnel factors In the automation project cycle. Because we do not understand the theoretical methods of construction planning, only by virtue of experience managing the construction process. The result is sometime busy and sometime idle. Schedule, quality and construction cost index are not ideal and managers have nothing to do. To solve these problems. I use my knowledge of management and make some improvements. We learn successful management theory from other disciplines of the domestic large-scale project experience and Project schedule management. In the methods of automated construction schedule, we use the content of WBS structure and dual network graph theory notation to optimize the design stage, Finally, we form an intuitive Gantt chart schedule for Project manager. So that they know what can be done, reasonable arrangement construction worker and Ensure timely completion of projects. In order to ensure that the project can proceed smoothly as planned. We develop a training program so that relevant personnel have a global awareness and the ability to work. Managers can develop performance goals and monitor process to track the dynamic strategies to implement plan Anshan Iron and aluminum automation project is a representative of automation projects. The analysis of the project can be generalized. I wish to have a good reference for completion and decision of automation engineering industry. To summarize, I have done a prospect for the management methods of automation engineering industry.
Keywords/Search Tags:Automation Engineering, Project Management, management flow, management plan
PDF Full Text Request
Related items