The Strategies Analysis Of Construction Claims Based On Bargaining Game

Posted on:2014-01-03Degree:MasterType:Thesis
Country:ChinaCandidate:H S ZhangFull Text:PDF
GTID:2232330395499453Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Once upon a time, the concept of the claim in China is still a completely foreign concept. Lubuge Event emerging in the construction industry management thinking first, and then a few decades, the domestic construction management in the ascendant. As an important part of the project management, claims management level gradually increased. However, we need to see is that the number of claims with the engineering practice in the rapid growth of our existing claims management level of knowledge is still insufficient to meet the needs of the market. Especially in the second decade of the21st century has entered today, the increasing size of the project mine, also increasing the amount of the project claim the event of a claim construction site across the country almost every day. However, because of the contractors and owners for process claims not yet seriously concerned about the claims events more disorder, confusion, whether contractors or owners are not satisfied with the results of the processing of claims. This is particularly reflected in the Contractor’s body, many contractors are afraid, no, do not know, can not be scientifically valid claims, even claims events become the largest platform for the intensification of the contradictions between the contractor and the owner. These problems, making engineering claims the very real and urgent.First to analyze the current situation and problems existing in the present stage the project claim, and through the use of economic theory in the classical game theory strategy, contractors and owners of the most important economic stakeholders in the claims process engineering claims choice behavior analysis, designed to take advantage of the bargaining game this classic model to solve quantitative part claims through negotiations to resolve the dispute, the right to make a claim management techniques to explore and try. Finally, combined with the analysis of actual claims cases, a scientific and rational engineering claims strategies can help contractors and owners to protect their interests as early as at the same time, the project has progressed smoothly and maintain good corporate reputation.
Keywords/Search Tags:Construction Claims, Bargaining Game, Game Strategy Analysis
PDF Full Text Request
Related items