Font Size: a A A

5.12 After The Earthquake Disaster Zone, Sports Fitness Facilities Development Present Situation And Countermeasure Research

Posted on:2013-06-03Degree:MasterType:Thesis
Country:ChinaCandidate:H M LuoFull Text:PDF
GTID:2247330377455056Subject:Physical Education and Training
Abstract/Summary:PDF Full Text Request
Beichuan-northwest of Sichuan river, mountains and rivers,since ancient times for the Qiang, the only Yu birthplace, red cultural village, with twoQiang, Tibetan, Hui, Han people live with peace. Cannot bear to think of the past, in2008May12th four twenty-eight not occur even in a hundred years, the magnitudeeight earthquake in Beichuan three thousand three hundred square kilometers to bereduced to fragments, twenty thousand people buried in the rubble, more than20millions homeless, loss of nearly sixty billion yuan, this irruptive its to the disaster forthe people of Beichuan have suffered crowning calamity, but the disaster is love, stateleaders called on the whole people Beichuan post-disaster reconstruction, reconstructionof Beichuan by central high level attention, in May22nd, the Political Bureau of theCPC Central Committee, the premier of the State Council, the State Council earthquakerelief headquarters command Wen Jiabao returned to Beichuan to study called" mustmake a new Beichuan". Then with the help of the community raised a total of$15370000000of funds to rebuild. Among them,4300000000with funding from theShandong building, central, provincial and local levels to throw3255000000yuan,social donation fund410000000yuan, society, market and enterprises invested5000000000yuan, local finance or up to2405000000yuan of funds. Ready to create anew security, livable, characteristic, prosperity, civilization, harmony "of the moderncity. A modern city not only requires a comfortable living environment, convenienttransportation, good infrastructure, but also requires the corresponding sports facilities.In this paper, using the method of literature, questionnaire, mathematical statistics,interviews, logical analysis and other research methods, on the collected data andsurvey data from the system point of view, the perspective of management analysis of5.12earthquake hit Beichuan new county sports facilities construction present situation,discovers restricts the Beichuan new order County Sports facilities are the mainproblems in the development of Sichuan Province, for post-disaster reconstruction(sports facilities) provide valuable development countermeasures and suggestions topromote the theory, Sichuan Province post-disaster reconstruction of sports fitnessfacilities in the rapid development, we look forward to China and world sports fitnessfacilities in the reconstruction of post-disaster reconstruction and make duecontributions to. The results show that: the Beichuan new town post-disaster reconstruction ofsports facilities are the main problems:(1) the number of sports facilities is obviouslynot enough;(2) no disabled only sports fitness facilities;(3) the post-disasterreconstruction costs for sports facilities construction in terms of the lack of funds;(4)sports facilities utilization is insufficient;(5) the school sports facilities open to theoutside world is not enough (hardly open);(6) the school sports facilities, sportsequipment is not worth badly also.In view of the above problems, the future in order to post-disaster reconstruction insports fitness facilities in the construction of more perfect, promote Beichuan QiangAutonomous Region sports fitness facilities and fast development of Beichuan County,according to their own actual situation, put forward the following countermeasures:(1)continue to increase sports facilities construction funds, so that the sports facilities inthe quantity and quality aspects of continuous improvement;(2) attached to the schoolsports facilities development;(3) to further increase the school sports facilities openingdegree;(4) pay attention to disabled sports facilities construction;(5) maximize theutilization rate of sports facilities.
Keywords/Search Tags:post-disaster reconstruction, sports facilities, present situation, countermeasure
PDF Full Text Request
Related items