| Recent years, with the rapid economic growth in the city, as well as large rigidhousing demand, real estate prices continue to rise."The price""land" become hotsearching word of Chinese network. It becomes one of the most concerned about topicof Chinese people. How to develop real estate better and faster meaning well solvingand balancing on land, supply and demand contradiction and impotent problem, is thereal estate project management emphasis. Therefore, Municipal Development andReform Commission of the city of Tianjin in combination with the local actualsituation to actively explore the "house with exchange" the construction of new townsand villages of the new way, through the new land transfer mode of comprehensiveplanning of urban construction, developping opened up a new way of thinking of realestate. The town of real estate industry demonstration project is a newly emergingthings, for model town project cost control optimization research field are rarelydiscussed.With the own experience and the case of Balitai model town project, the authoruse the theory of modern project management method and technique, the constructionof model town of cost control technology uses the problem carried on comparativelysystematic analysis and research. This paper describes the differents of the modeltown project and general real estate projects cost form, studies deeply on costoptimization measures, methods, including Balitai model town in the process ofproject implementation experience. In the third chapter as the case of Balitai modeltown, using the EVM of earned value method of model town first phase constructionproject cost control, at the same time, the paper established the validity of the EVMmodel. The paper concludes with a summary of a phase of construction cost controlexperience, putting forward to construction the prediction and suggestion to thesecond of the period. |