The Pre-construction Risk Management Of AnTing Crown Plaza

Posted on:2015-02-02Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y ZhangFull Text:PDF
GTID:2252330425484384Subject:Project management
Abstract/Summary:PDF Full Text Request
The construction projects are affected by various kinds of risks, so it is particularly important to run the risk research. Now the owners are more concerned about the economy of the project and will transfer the risks to the companies which have the construction contract, and it will be much likely to suffer economic losses if you do not pay attention to risk control.Pre-construction phase refers to a contract from the tender stage, the early stage of construction is the most important part of the construction activities. At this time, the risk management will affect the conduct of the entire process.The risk can be found and prevent in time as long as the risk control is being emphasized in the pre-construction. Due to the construction project bidding and the contract phase characteristics combined with the status and risks of the markets and companies faced with in the current time, this article presented more systematic strategies and policies of the construction, studied bidding risk identification, risk analysis, risk response and some technical means of the construction project. And also issued some risk prevention measures for tender to contract performance that against the problems raised before.
Keywords/Search Tags:Bidding, Contract, Risk Management
PDF Full Text Request
Related items