Study On Control Of Risk Of Wind Farm Project Loan Project Of Syrcb

Posted on:2015-02-06Degree:MasterType:Thesis
Country:ChinaCandidate:S J TanFull Text:PDF
GTID:2269330428467381Subject:Project management
Abstract/Summary:PDF Full Text Request
It is necessary to achieve effective project work for the project managementand control. Although project risk control is an important part of risk management,that’s mean it is the most important part of the project risk control. Project riskmanagement is the process of project risk project managers then formed, accordingto the identification of risk and the risk of discovery, risk analysis, risk control tospecify the measures of risk control and management, and strive to project the lowestrisk projects to maximize profits.SYRCB wind farm project loan program is the financial risk of the project,whether the risk can be controlled, it is related to the bank’s profits. In this paper, theanalysis on risk control is of great significance.In this paper, risk control studies on the SYRCB wind farm project loanprojects, for example, introduces the research background of the loan risk controlprojects, and research significance, can grasp the changes in project risk, foundsignificant risks and correct; projects to improve risk control method, the project riskmore accurate control and research methods. Meanwhile, through the wind farmproject loan project risk identification, it could be found that the risk of its existence.There is credit management system compliance risk, guarantee risk, prepayment risk,the risk of post-loan management. Then, focusing on the financial situation of loanprojects can repayment guarantee, the market situation for risk analysis. From theanalysis of financial condition and liability structure, equity structure, financialstructure, it makes profitability and solvency aspects. As Repayment for analysisfrom the first source of repayment, the second source of repayment terms. The ability of the guarantor guarantees to analyze the feasibility is of guarantees foranalysis. Market conditions from the industry, trade barriers, policy implications,upstream and downstream industries, competitive aspects of the project wereanalyzed.In response to these problems, combined with the basic principles of projectrisk control, and finally to develop a risk exists of four risk control measures: riskcontrol measures SYRCB credit management system, the repayment risk controlmeasures SYRCB farm project loan projects, guarantee risk control measuresSYRCB farm project loan projects, risk hedging measures SYRCB wind farmproject loan program. First, we can establish and improve credit managementorganizational structure, operational processes reengineering of credit, creditmanagement system was constructed to strengthen the industry, industry informationguidance, strict credit monitoring, inspection and accountability, strengthen creditranks. Second, from the first source of repayment, we can get the second source ofrepayment and repayment control. Third, the guarantee is to ensure security of theguaranteed party control. Fourth, focused on the operation and cash flow positionand changes in circumstances, the implementation of the credit risk early warningsystem and a significant risk reporting system, strengthen the follow-up examinationafter routine credit management. Through risk control, risk management in order toachieve with the purpose of reducing risks.Through the analysis of SYRCB wind farm project loan project risk controlissues and the status of risk control measures proposed wind farm project hopeSYRCB loan projects to better control risk and maximize profit project; while alsofor the future risk control can be worked to provide some suggestions.
Keywords/Search Tags:Risk control, Wind Power Plant, Risk Analysis
PDF Full Text Request
Related items