Font Size: a A A

Reseach On Construction And Projection Of Waiting For Lockage Anchorage Of Three Gorges Dam To Miaohe River

Posted on:2015-03-14Degree:MasterType:Thesis
Country:ChinaCandidate:J F ZhuFull Text:PDF
GTID:2272330431488802Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
The Three Gorges Reservoir Region changed of natural conditions in water depth and water level dynamic increase and shoreline evolution and bad weater increase,changed of shipping trends in large vessel and standard shipping and traffic volume dynamic increase,these geted some special areas ought selection homologize anchor ways after175m impoundment of TGP. Anchorage is places of ships eluding bad weaters and ships wating for lockage, anchorage’s capacity direct influence shipping’s safety. Present, these aren’t system research on analysis and test anchorage’s practice demand capacity according to implementation and anchorage projection of three Gorges Dam to miaohe river. Therefore,It is necessary of reseach on construction and projection of waiting for lockage anchorage of three Gorges Dam to miaohe river.lt enable provide on basic datas and important technical references for the reach’s anchorage construction, and foundation for construction by stages too.Firstly,this paper investigated and collected distribution and capacity and anchor way of excisted anchorages in three Gorges Dam to miaohe river,and analysised educe existed anchorage’s capacity severity insatiability present demands,this is main problems in anchorage usage now.Consequently it is pressure of anchorage construction and projection in researching reaches.Secondly,according to ship measure and anchor way for watiting for lockage in this reach,analysised and calculated ships desired anchoring parameters for anchor position’s water depth and area and so on. First time of calculation and analysis on desired anchor quantity based on empirical formula-static method and queuing theory-dynamic method,again analysised and discussion on applicability of the two methods.Finally,individual proposaled general planning scheme of anchorage’s short-term and long-term according to suitability and availability coastlines or water areas,suggested construction timing for short-term anchorage construction is before2015year and long-term anchorage construction is before2020year.
Keywords/Search Tags:three Gorges Dam to miaohe river, freight of changjiang river, anchorage capacity, anchorage projection
PDF Full Text Request
Related items