The Evaluation About Project Quality Management Of Expansion In Ping Le35KV Transformer Substation

Posted on:2015-07-23Degree:MasterType:Thesis
Country:ChinaCandidate:J Y LiuFull Text:PDF
GTID:2272330434457722Subject:Project management
Abstract/Summary:PDF Full Text Request
Quality is the soul of a project,so in the process of running the qualitymanagement of the project is essential.Pingle35KV Substation Rehabilitationproject actually is a project of rural power grids project.It inherits thecharacteristics of power construction projects with large investment,complextechnology, equipment, coordination area wide, long construction period and so on.If this project can run effectively,to a great extent, it will improve the livingstandards of the procession of Meng Jin ping le areas.The article first analyzes the research background and significance,currentresearch of the quality management in PingLe35KV substation project.Then thepower project quality management theory are described (including the principlesand evaluation methods),then a simple overview about the basic overview ofPingle35KV substation Rehabilitation project is to b done,followed by anotherquality management of the project has been re-combing.The paper analysis thequality management PingLe35KV substation Rehabilitation project from four fullin detail which include the preparation of project quality management organization,preparation (The organization construction,system, the safety management,qualitymanagement, technology management, financial management, materialsmanagement), project quality management (project preparation stage qualitycontrol, quality management, project construction phase, the project completionstage quality assurance, quality assurance project commissioning phase), projectquality assurance measures (institutional, technical, material, process control,works Progress Administration project quality inspection and test run), laterun.Then establish the index system based on these prepared work, consulting anumber of experts, questionnaires,and then summarize these data as an evaluationof the raw data analytic hierarchy method to calculate index warrants, Tosummarize the data as the raw data and using analytic hierarchy process (AHP) tocalculate index warrants.After verifying the consistency,using fuzzy to evaluateexpert’s comments.
Keywords/Search Tags:project quality management, quality evaluation, AHP, Fuzzy
PDF Full Text Request
Related items