Font Size: a A A

Study On Investment Risk Management Of The 300 Thousand Party LNG Project In Songyuan City

Posted on:2017-01-12Degree:MasterType:Thesis
Country:ChinaCandidate:Z DingFull Text:PDF
GTID:2309330488486013Subject:Project management
Abstract/Summary:PDF Full Text Request
Recent years, with the rapid development of the global economy, energy sources presents an increasingly scarce situation. Traditional energy in coal and oil in the combustion process has also brought a huge environmental pollution problems. Sustainable development of green economy and circular economy has gradually become the new direction of economic development. People are constantly looking for more clean, environmentally friendly, reliable sources of energy to improve the structure of traditional energy sources. Between coal, oil and natural gas belong to mutual alternative energy. Between the three calculated by the same amount of heat, the price of coal is the lowest, the price of natural gas is triple of coal price, while the price of oil is about five times the coal price. In the context of high oil prices, the consumption of coal and natural gas increased naturally. From the use of the economic benefits of oil and gas, they are of about the same, from an environmental point of view, natural gas is more environmentally friendly than coal and oil. From the perspective on a global scale, there are more and more countries are using liquefied natural gas, and interested in it.China’s energy structure is mainly dominated by coal, oil secondly, natural gas accounted for only a small proportion, far below the world average. With the country’s demand for energy growing, liquefied natural gas (LNG) of low pollution will to optimize the energy structure of our country, an effective solution to energy supply security, protection of the ecological environment of the dual problem, realize the sustainable development of economy and society has play an important role.The main content of this paper is to Songyuan City, the 300 thousand party LNG project as the research object, the main research of the project is investment risk management. The first in-depth analysis of project investment risk management theory, domestic and foreign research and investment risk management techniques. And taking the LNG project construction project of Songyuan city as an example, the risk of the investment of the project is analyzed in detail, and the risk identification is carried out. Then the qualitative analysis is used to analyze the financial situation; Sensitivity analysis, profit and loss balance analysis of investment influencing factors; Analysis of the economic benefit of the project by using the analytic hierarchy process. Draw the conclusion that the project has good investment price and good investment environment. According to the risk factors, summed up the risk prevention and control measures, the project can be realized on the basis of the evaluation of the risk to achieve the purpose of prevention against.Investing and researching the risk analysis of Songyuan LNG project, Combined with our current risk control measures,that can guide LNG enterprises to better risk management and gain stable investment.SO the study has important theoretical guidance.
Keywords/Search Tags:LNG, Project investment, Investment analysis, Risk managemen
PDF Full Text Request
Related items