Font Size: a A A

Research On Risk Management To Establish Pipeline Filter Project Of The ACC System In Heavy Plate Rolling Line In Baosteel

Posted on:2015-03-30Degree:MasterType:Thesis
Country:ChinaCandidate:J J WangFull Text:PDF
GTID:2311330512471379Subject:Project management
Abstract/Summary:PDF Full Text Request
Risk management is a management method developed from America,Germany and other countries at the 20s century.It started from the analysis of the risk of enterprise,discussed the cost of risk and how to restore the stability of the enterprise financial,business vitality,and the effective use of resources.In our country,since the 21st century,with the development of national economy,there are more and more engineering construction,and the market risk becoming bigger and bigger.It has an important practical meaning to view project investment decision-making of global optimization and the overall design and management in risk control and management on construction engineering projects,to combine technology and economy,and to make it more effective in the investment,construction period and the quality.Maintenance improvement project is one of the regular reconstruction ways in manufacturing industries nowadays.The main processes consist of approval,design,purchase,construction and acceptance.Project risk management is a dynamic process of planning,identification,assessment,response,monitoring to the possible risks.Also,it can achieve maximum security with scientific management methods.The ACC system is entrusted by the production unit to assist to complete the substitute water with metal project for the lower cost and the higher quality,and to improve profitability finally.To achieve the goal of the production units,to avoid unnecessary problems,and to ensure project completed on schedule,also can meet the design requirements to achieve the purpose of substitute water with metal,project management of the project to conduct a comprehensive study is particularly important.The essay is established in the whole stages of the pipeline filter project,combined the online production characteristic,introduced the current situation of the ACC system,the background of the substitute water with metal project,and the general situation of the pipeline filter project.Based on the above,the essay anylisis the risk factors of all the stages,and take measures to the key factors.In the process of the risk management,we divided the risk factors into time risk,technical risk and security risk,found out the key factors with the analytic hierarchy process,and draw up the effective measures to each factor to the complete success and achieve the expected objectives.
Keywords/Search Tags:Risk Identification, Risk Assessment, Risk Response, Risk Control
PDF Full Text Request
Related items