The Research On The Improvement Of FuRunYuan Project Schedule Management

Posted on:2016-02-23Degree:MasterType:Thesis
Country:ChinaCandidate:Y G CuiFull Text:PDF
GTID:2322330485958624Subject:Project management
Abstract/Summary:PDF Full Text Request
The research on the technology of project progress management is very early, regardless of the results of many studies both at home and abroad, many theories have been verified by engineering and proved the feasibility and validity. As the project towards large-scale and complex development, the progress of the project management level and higher, only to rely on single management technology or only pay attention to the project as a part of the management, to management. As the project progress management plan, must be systematic, effective and practical.In this thesis, through the analysis of the problems facing Fu RunYuan project schedule management, the progress management of mature technology and principle, the FuRunYuan project to develop a project schedule management plan, the inclusion of WBS, schedule plan and schedule control. First of all to carry out WBS work before construction, followed by preparation of Gantt chart and network diagram schedule. During the construction, the earned value method is used to monitor the progress of the schedule, and the deviation is found, and the cause of the deviation is analyzed by causal analysis method, and then the corresponding measures are formulated.. Earned value method can also predict the basic construction of the next stage, and can take measures to ensure the progress of the schedule.In the project after the completion of the development, into the project actual implementation phase. In this thesis, the analysis of the whole process of the project schedule management, shows that this scheme is effective to the project schedule management and the progress of the project management is positive effect. At the same time, this paper extracts the data of the progress management in the project, and simulates the process of the FuRunYuan project by P6 software.Through simulation of the progress management of FuRunYuan project, the advantages of P6 software are summarized. At last, the development trend of project schedule management is prospected.
Keywords/Search Tags:schedule management, Earned value method, scheduled plan
PDF Full Text Request
Related items