Font Size: a A A

Large-scale Water Conservancy Project Life Cycle Cost Risk Analysis

Posted on:2017-12-04Degree:MasterType:Thesis
Country:ChinaCandidate:B ChangFull Text:PDF
GTID:2322330488987792Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, with countries to strengthen water conservancy construction investment projects, particularly in the January 29, since the "CPC Central Committee and State Council on Accelerating the development of water reform," the official announcement, the state decided to vigorously promote the construction of flood control projects, small and medium sized reservoir reinforcement construction, water conservancy project construction, river ecological environment construction of a large number of water conservancy projects, most of which are large-scale water conservancy projects.Construction of water conservancy project implementation has long construction period,large-scale investment, construction environment is complex, involving a wide range of personnel involved in complex, large amount of investment, long time, widespread social impact, and other unique characteristics of complex immigration cases, therefore, it construction and implementation, operation and maintenance of the process reflects the many different types of risk factors, which makes the whole life cycle cost theory to the construction of water conservancy project risk analysis is necessary.This article is based on research scholars with personal reflection and study a combination of income and a brief description of the life cycle cost theory, the theory of the life cycle cost for large-scale water conservancy projects, and with the large water conservancy project examples combined with the large-scale water conservancy project is divided into project decision-making phase, design phase, implementation of construction,completion and acceptance of, operation and maintenance of the demolition of six stages payback.Full life cycle cost theory, based on the cause of each cost in different periods of risk factors, the actual situation of cost control. Identification, selection, different than the next period, the life cycle cost of risk factors influence risk factors determining a right weight, and then to a different sort of risk factors, influence the establishment of relations. Thereby constructing large water conservancy project life cycle cost risk analysis system, and expert survey method and analytic network process used in large-scale water conservancy project cost risk analysis, through engineering examples of calculation, analysis, special attention should be obtained in different periods of theory and method for providing operational cost risk factor for the large-scale water conservancy project life cycle cost of risk control.
Keywords/Search Tags:Large-scale water conservancy projects, hub project life cycle, the cost of risk, risk analysis, analytic network
PDF Full Text Request
Related items