Font Size: a A A

Study On The Risk Management Of The Early Stage Project Of The Lianghekou Hydropower Station

Posted on:2017-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y J LongFull Text:PDF
GTID:2322330512464399Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of social economy,people reform the living environment by virtue of knowledge and technology.Undoubtedly,it may cause more or less risks in the reform process.In terms of engineering projects,a construction project is an important constituent part in modern social economic activities;The significance lies in realizing risks of engineering projects through risk identification,risk analysis and risk evaluation,using various risk handling measurements,management methods,technologies and means to control project risks reasonably and effectively based on it,coping with adverse consequences and ensuring management realized by overall targets at the least costs.Based on the preliminary project in Lianghekou Hydropower Station and aiming at uniqueness,disposability,integrity,stationarity,uncertainty and irreversibility,etc.,the paper elaborates risk identification,analysis and how to do dynamic management on preliminary project risks in Lianghekou Hydropower Station.First of all,according to physical truth of preliminary project in Lianghekou Hydropower Station,the paper identifies existing risk types and elaborates them one by one,analyzes risks in details based on preliminary geological survey,natural environment,human geography,construction layout,construction scheme,construction technology,management system and planning measures,replies construction scheme and construction technology in line with analysis results,and formulates management system,measures and contingency plans,so as to reach risk prevention,risk remission,risk transfer,risk retention and risk utilization.By managing preliminary project risks in Lianghekou Hydropower Station,the serious duration of preliminary project in Lianghekou Hydropower Station is controlled obviously,so as to save the duration and investments for owners.By managing preliminary project risks in Langhekou Hydropower Station,the serious geological situation of the preliminary project in Lianghekou Hydropower Station is controlled effectively.During the process of the preliminary project,there are no geological disasters for personnel reasons.By managing preliminary project risks in Lianghekou Hydropower Station,the serious safety situation of the preliminary project in Lianghekou Hydropower Station is controlled effectively.During the period of completion,there is no major safety accident for artificial causes.By managing preliminary project risks in Lianghekou Hydropower Station,serious coordination of the preliminary project in Lianghekou Hydropower Station is controlled effectively.There are no disputes between villagers and project construction or between nationalities.To sum up,after adopting effective measures to do dynamic risk monitoring,risk management has acquired obvious benefits and brings about indispensable management experience in subsequent subject construction of Lianghekou Hydropower Station.
Keywords/Search Tags:Lianghekou Hydropower Station, pre project, risk analysis, risk management
PDF Full Text Request
Related items