Research On The Schedule And Control Of Tianmushan Road Construction Project In Dongying City

Posted on:2018-04-24Degree:MasterType:Thesis
Country:ChinaCandidate:W GengFull Text:PDF
GTID:2322330512473424Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
Tianmushan construction project is a is located in Dongying city things between cities,collection development,production and service life of urban trunk road.,after the completion of the project to Dongying industry the development of national economy,the change of social economic structure,to provide a powerful epitaxy expand of the city of what conditions,to improve the regional investment environment,the development of regional social economy all has the extremely important practical significance.Because for the urban area,where the project is located,the construction environment is complex,and travel on surrounding residents and enterprises various effects to transport.Therefore,how to guarantee the quality of the project,as far as possible,shorten the project time limit for a project,make project to plan in advance or put into use,is the most important of the project construction unit needs to focus on solving the problem.Therefore,you need to build a more scientific and effective system of schedule management,improve the ability of project schedule management and control,to ensure its effective implementation,so as to ensure the implementation of project master time schedule.This dissertation embarks upon the actual situation of the Tianmushan construction project,make the main objectives and tasks of project progress management.Use the WBS PERT network planning technique to establish the schedule planing of the project.Based on above works,the dissertation has optimized the schedule planing to complete the objective of time management.In the construction process of the project,according to the schedule plan,the dissertation elaborate the constructing procedure and method of schedule control.Discover the schedule deviation by dynamic monitoring daily and regularly,anduse the earned value method to calculate it in the different stage of progress,analysis deviation of main effects,according to progress control of actual requirements update the schedule plan,proposed the ideas and ways to have the schedule updated.Finally,in order to safeguard the effective execution of the schedule control of the Tianmushan construction project,from the coordination of resource management,controlling,organizing cooperation in the establishment of specific safeguards,so as to ensure that the realization of the project schedule management target.The paper can increase the level of implementation of the project schedule management effectively by researching on the schedule and controlling of the project,and can enhance project Division of the duration of the project scheduling and control,perfect the mechanism of project progress management,also provides a blueprint of schedule control for other similar project.
Keywords/Search Tags:Tianmushan construction project, Schedule, Schedule control, The network planning technique, Earned value method
PDF Full Text Request
Related items