Font Size: a A A

Research Of The Project Schedule Management For The National Defense Techmology Foundation Projects

Posted on:2017-07-12Degree:MasterType:Thesis
Country:ChinaCandidate:X DongFull Text:PDF
GTID:2346330533468846Subject:Project management
Abstract/Summary:PDF Full Text Request
This article takes the national defense technology base projects—“The calibration technology research with temperature of liquid hydrogen and oxygen sensor for space liquid engine” as the object of study.The project schedule management theory and method are introduced,collected a large amount of data and material,to satisfy the facts demand as the guidance,analyzed the present stage characteristics and urgent need of the national defense technology base projects,summarized characteristics,summarized the problem for level is not clear?schedule planning is not scientific?unable to effectively monitor,and so on.For the problem,the schedule management system is consructed,the responsibility?the structure of the organization and job content are break down by WBS method,level and element relationship are combed,schedule management system framework is designed,system principle is clear,doing research for the three level schedule management mode which base on the matrix cross responsibility system;Research on the development of schedule planning for the national defense technology base projects,the principles and contents of the schedule planning is clear,makes the schedule plan,including division of functions?work breakdown structure?responsibility assignment matrix?work order?time estimates.This article use the critical path menthod for complie the network plan,makes the path optimization and schedule update,obviouslty,this method short the project period;Research on the schedule control for the national defense technology base projects,control principle is expounded,this article,set up the schedule dynamic monitoring system and control process,put forward the specific measures for schedule control,summarizes the practical enlightenment for schedule control.The research of this article apply to the debelopment of the defense task demand for project management level,has the practical significance for schedule dynamic management?improve the ability of measuring project controls?improve the refine level of resource allocation.It could be satisfy the complex management issues for high technology of the national defense technology base projects,and also through the project implementation success,provide referenceand experience of management innovation for the national defense technology base projects.
Keywords/Search Tags:defense projects, schedule management, management system, planning, schedule control
PDF Full Text Request
Related items