Font Size: a A A

Research On Performance Evaluation Of Liaoning Aided Second Senior Middle School Project

Posted on:2018-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:L X JianFull Text:PDF
GTID:2346330566955288Subject:Marxist Administration Theory and Government Administration
Abstract/Summary:PDF Full Text Request
It is necessary to establish a complete,systematic and targeted performance evaluation system for the implementation of the national strategic decision.Evaluation and analysis of performance for the Yuanjiang project,in order to found Yuanjiang project problems and puts forward suggestions to solve the problem,it is proposed to support the central government and the recipient of the request,but also Yuanjiang work to steadily promote the scientific and efficient requirements.According to the field investigation and data analysis,we design the questionnaire and interview survey,data analysis using spass16.0 analysis,provides scientific data support for the evaluation index.A number of experts have been invited to weigh the weight of each index of the evaluation index system,which makes the performance evaluation system has some objective,scientific and feasible.Finally,this paper uses AHP to evaluate the project according to the index system.The first chapter describes the core concepts and theoretical basis of the full text.From the point of view of discipline and specialty,this paper expounds the three core concepts of "public project","counterpart support" and "performance evaluation".Using the theory of Marx's coordinated development,government performance management theory and system evaluation theory,as the theoretical basis of this study.The second chapter mainly introduces the research project in this paper.From the background of the project construction,the necessity of project construction,the implementation of the project and the initial effect of the project put into use.The third chapter is the construction and design of the performance evaluation index system.The performance evaluation of public project,need to set up an index system concise and accurate can be quantified,the construction of the index system is the core of performance evaluation is carried out smoothly,the key factors of the impact assessment results.This chapter in the construction of evaluation index system of project performance follow the systematic,scientific,qualitative and quantitative,practical and goal oriented principle,combined with the research object involved extensive,multi variables,this paper from a variety of evaluation methods,selection of analysis method and combination method,and reference target level method.Complete the construction of the evaluation index system.The fourth chapter carries on the comprehensive appraisal to the research project.The results of the evaluation of the overall performance of Yuanjiang project is excellent,and the advantages and disadvantages of the project are evaluated objectively.
Keywords/Search Tags:construction project, system construction, performance evaluation, proposal
PDF Full Text Request
Related items