Font Size: a A A

Oversea Project Management Research Of X Center

Posted on:2018-06-10Degree:MasterType:Thesis
Country:ChinaCandidate:X H LiFull Text:PDF
GTID:2347330518966331Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
In today’s internationalization mode,education should also be geared to the needs of the world,to cultivate students with international vision,overseas travel activity is able to accomplish this mission in the process of students growing.This paper starting from the necessity of study activities,the system elaborated the organization development of oversea activities,the background,purpose,organization,management,travel team,problems existing in the process of study,etc.Studied through literature,field survey methods such as the problems existing in the center of oversea project X,by the application of project management knowledge to analyze the crux of the problem,management study activities,the decomposition process of each link,to achieve standardization process operation.Responsibility for X center project operation department personnel analysis,process management,so as to optimize travel organization process.This paper puts forward the improvement scheme of X center of oversea organization has a certain reference value.Finally,the paper puts forward some Suggestions of improvement of oversea project management: first,learn to swim,you’ll learn to swim.Second,pay attention to product development,divided into consumption level;The third,changing the concept of travel,enhance school-running ideas;Fourth,strengthen the marketing hype,distinguish decision-making audience;Fifth,vigorously promotes the quality monitoring,security personnel training;Sixth,improve the travel policy,strengthen market oversight.
Keywords/Search Tags:travel, activity, analysis, management, to, optimize, organizational, project, process
PDF Full Text Request
Related items