Font Size: a A A

Cold-laboratory Certification Project Schedule Management Research In Shougang Steel Qianan Corporation

Posted on:2016-06-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q ZhangFull Text:PDF
GTID:2359330512970949Subject:Project management
Abstract/Summary:PDF Full Text Request
Iron and steel industry is an important basic industry department in China,and it is the material basis for developing national economy and national defense construction..With the development of economy and science and technology,the demand for iron and steel in every country is increasing..And the relocation of Shougang steel as to create first-class iron and steel enterprises as the goal of the iron and steel enterprises,in order to produce more high quality cold rolled steel,enhance the competitiveness of their own industry,the relocation of Shougang steel will cold rolling laboratory certification program.This topic is mainly in for the relocation of Shougang steel laboratory certification program to study the progress based on to project management and schedule management theory as the basis,clear the project schedule,analysis the practice recommendations and the existing problems,and puts forward the suggestions to the improvement of the progress,promote the relocation of Shougang steel laboratory accreditation project schedule development,promote the laboratory certification program completed according to plan..This research is based on the steel cold rolled steel laboratory certification program as an example,mainly from the following aspects of the progress of the project to start research and analysis:for the relocation of Shougang steel laboratory cold rolling project schedule preparation,implementation,inspection and adjustment were introduced and analyzed;at the same time,the establishment and implementation of the schedule problems are analyzed,and puts forward the countermeasures against the.proposed Shougang steel cold rolling laboratory certification project schedule management plan,including the overall plan and plan decomposition;through of Shougang moved cold-rolled steel laboratory accreditation project schedule control analysis method and improved method of in-depth study,and summarizes the reasons of the factors influencing the progress,based on proposed project schedule control processes and procedures and project schedule control assurance measures are implemented.this topic is for the relocation of Shougang steel cold rolling laboratory accreditation project schedule management method were studied,aiming at the problems in the research to solve,put forward to promote the laboratory accreditation project schedule management is the effective method.
Keywords/Search Tags:Command center project, schedule, progress control
PDF Full Text Request
Related items