Font Size: a A A

Study On The Performance Evaluation Of Rural Small Water Conservancy Project Management System Reform

Posted on:2016-07-01Degree:MasterType:Thesis
Country:ChinaCandidate:S H WangFull Text:PDF
GTID:2359330512972689Subject:Public Administration
Abstract/Summary:PDF Full Text Request
In 2011,the No.1 document of the Central Committee of the Communist Party put forward decided to strengthen the irrigation and water conservancy and other weak links in the construction,guide a farmer to voluntary labor,accelerate the construction of small-scale farmland water conservancy in key counties such as,followed by the introduction of the country issued the guidelines on deepening the management system reform of small water conservancy projects,in certain parts of the country to carry out water conservancy project management system reform at the same time,we must further deepening of management system reform of small water conservancy projects,strengthen the management of small water projects.This thesis is based on national second batch of rural reform pilot area,irrigation and water conservancy facilities,property rights system reform and the innovation of management and protection mechanism test project,performance evaluation of rural small-scale water conservancy project management system reform.On the basis of consulting the domestic and foreign water conservancy project management system reform and performance evaluation,the paper defines the concept of performance evaluation of small water conservancy project management system reform,and briefly expounds the theoretical basis,combined with the work practice,and constructs the performance evaluation index system of small water conservancy project management system reform.In the design and construction of small water conservancy project management system reform performance evaluation index system,using frequency analysis method and expert consultation method,screening the behavior and reform of the implementation of the results of the evaluation index,build the reform design of the scientific,reform the implementation of the efficiency,the efficiency of the economic benefits of reform,reform of the efficiency of the efficiency of the social benefits of 5 sub system level,the sub system,a total of 14 specific evaluation index.In the research method,the paper uses the method of AHP and fuzzy comprehensive evaluation to determine the index weight,and then use the fuzzy comprehensive evaluation method to evaluate the index,and the Hongze County of Huaian city as an empirical case,combined with the questionnaire survey and questionnaire survey method,collect the data from Hongze County of Huaian province.Through the analysis of the research,it is concluded that the performance evaluation of the small water conservancy project management system reform in Hongze county is excellent.Its two 5 level indicators and three 14 level indicators,in addition to the irrigation guarantee rate,the actual rate of water charges,irrigation water use efficiency,water conflicts and disputes,the occurrence rate of good,the other evaluation results are excellent.According to the results of the performance evaluation,puts forward four suggestions:one is to speed up the operation of the market,stimulate the vitality of rural development;the second is to accelerate market-oriented operation,to stimulate the vitality of rural development;the third is the implementation of water resources protection and management of project funds reserved for the system;the fourth is improved irrigation techniques,to promote agricultural water-saving transformation.
Keywords/Search Tags:small water conservancy project management system reform, performance evaluation, analytic hierarchy process, fuzzy comprehensive evaluation method
PDF Full Text Request
Related items