Font Size: a A A

Time And Quality Management In CH Company National Census Applied Research Project

Posted on:2018-12-06Degree:MasterType:Thesis
Country:ChinaCandidate:F K WuFull Text:PDF
GTID:2359330512981385Subject:Business Administration
Abstract/Summary:PDF Full Text Request
CH company is Zhongshan's largest surveying and mapping enterprises,with the national class mapping qualification,has won the national,provincial and municipal scientific and technological progress award more than 30 items,the company grows up to now provides a large number of Surveying and mapping production and service for the land and housing management,Zhongshan city planning and urban construction.Since 2010,the rapid development of Surveying and mapping geographic information industry,the scale of Surveying and mapping project is getting larger and larger,the quality requirements are also getting higher and higher,but there is no detailed management of CH project management tools.Project management is lack of scientific and rational planning,implementation and adjustment of arbitrariness,the implementation process often appear first and then later,in order to neglect the progress of the project quality control,part of the project can not be completed in accordance with the established goals,the project management system and the current situation of contradiction is serious,urgent CH census project time and quality management.The national census CH project is a political task,the national census results as the initial data of geographical conditions monitoring,the project has tight time requirements,high quality requirements,the characteristics of technical difficulty,how to do the project time and quality management is an urgent problem to be solved.In this paper,from the time management and quality management of the project and the existing problems,combined with the actual management experience,with the help of modern project management theory and methods to explore suitable for the project management model.Time management method,combining theory and practice,the project activity decomposition,scheduling,resource and time,by estimating the activity plan and plan control steps to carry out the work,the program evaluation and review technique(PERT),Gantt chart,critical path method,management science analysis method,carry out the various stages of the project work in the actual production process and part plan deviation through resource adjustment,compression to another stage of the critical path time,ensure the overall progress of the project.From the aspects of quality management,quality planning,quality assurance and quality control of the quality control system,verify the PDCA circulation method and comprehensive quality management method with quality,through before,during and after the quality control method,put forward the quality awareness of employees,ensure project quality to meet the requirements of national census planning.This paper is an attempt to explore the project theory of national census project,and it is hoped that it can be used as a reference for similar projects in the future.
Keywords/Search Tags:project management, time management, quality management
PDF Full Text Request
Related items