Font Size: a A A

Schedule Management Research For Certain Model Automatic Flight Control System Initial Prototype Of X Company

Posted on:2017-09-30Degree:MasterType:Thesis
Country:ChinaCandidate:L G WangFull Text:PDF
GTID:2359330566456463Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
With the increasing development of our national defense capabilities,X Company,as an important airborne equipment complement unit,has undertaken multiple development task of key model driven by national weapon's major development.However,Traditional management method can't meet users' needs.To maintain its current status in the aviation market,it is in sore need of combining the model project management with the most practical and newest management theory.In this way,aviation project management level can be enhanced.Meantime,it can also stimulate the fresh vigor and vitality of model project management.Schedule management is a significant step of project management.On the basis of introducing basic theory and method of concept,process and principle of project schedule management,the thesis reviews and concludes company's aviation model development project progress management's current condition and existing problems.Because the complexity and uncertainty of aviation model development project is a basic starting point of progress management,so the thesis analyzes principle and procedure of progress risk management,risk identification and the method,frame and flow of risk analysis and assessment;discusses the principle,method,process and trend of aviation model development project progress control inclusively and in detail;introduces basic theory and optimization method of project progress schedule's adjustment and optimization.At last,the theory and method of project progress management,control,and optimization are applied to the development project of certain automatic flight control system.It mainly talks about the progress management organization system of certain automatic flight control system‘s initial prototype development project and the duty of various organizations during the course of progress management.It also lists major progress risk factors and events of automatic flight control system‘s initial prototype development project and expounds the key points of progress management in various steps.It carries out an instance analysis to project progress' s optimization problems of certain automatic flight control system with progress optimization method to realize the effective control of aviation model project progress.
Keywords/Search Tags:Aviation model development project, project schedule management, schedule control
PDF Full Text Request
Related items