Research On Risk Management Of Qinggangping Coal Preparation Plant Construction Project

Posted on:2020-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:Z LiFull Text:PDF
GTID:2381330590959602Subject:Project management
Abstract/Summary:PDF Full Text Request
Coal is the basic energy to support the economic development of our country,coal accounts for up to 59.1%of the primary energy consumption,and the coal industry will remain the pillar industry of China's energy.However,environmental pollution and resource waste caused by the production and use of coal are still serious.As the technical requirements of coal preparation plant construction continue to improve,the capacity scale continues to increase,coal preparation plant construction project cycle is longer,engineering project complexity is higher,the capital demand is greater,facin.g the uncertainty factors thus increasing.In view of the above difficulties and risks that may occur in the construction of coal preparation plant,it is parti:cularly important to carry out effective risk identification and control.Qinggangping coal mine coal preparation plant construction project based on the green hills,as an example,through the four links of risk identification,risk assessment,risk response and risk control,this paper identifies and evaluates the possible risks in the construction project of coal preparation plant,and puts forward the corresponding countermeasures and control measures,providing reference for the risk management and feasibility study of coal preparation plant construction project,so as to improve the benefit of coal preparation plant construction project and reduce the project risk.Specific research contents are as follows:This paper first through consulting the project management and other aspects of literature and reports,to understand the research methods,research status and research,focus of related fields,on this basis,according to the actual situation of Qinggangping coal preparation plant construction project,AHP analytic hierarchy process,from the coal preparation plant construction project according to the source of risk selection of the technical scheme,economy,market,organization and management,natural and other risks were subdivided,using fuzzy comprehensive evaluation method for the comprehensive evaluation of all risk indicators.Rank the risk value of each risk factor in order of importance.Combined with the characteristics of the coal construction project of green hills,ping coal mine coal preparation plant construction project risk level of hierarchy,screening concluded:ping coal mine coal preparation plant construction projects in green hills,risk factors,there are two important risk,respectively is:the technical scheme risk,economic risk,There is 1 medium risk,namely:market risk;There are three general risks:organizational management risk,policy risk and natural environment risk.In view of the secondary risk factors of the important and medium risks in the construction project of Qingqangping coal preparation plant,this paper analyzes and studies them from the perspectives of risk response measures and monitoring.Finally put forward the proposals in the technical content,technical feasibility,project cost,product price four risk point,the basic countermeasures and build the risk control system,strengthening risk management,the development performance comprehensive monitoring of the computer system.
Keywords/Search Tags:Coal preparation plant, Risk identification, Risk assessment, Risk control
PDF Full Text Request
Related items