Take Boeing 777-200 Aircraft For Example-Large Aircraft Route Maintenance Project Schedule Planning And Control Achievement

Posted on:2018-07-28Degree:MasterType:Thesis
Country:ChinaCandidate:T PengFull Text:PDF
GTID:2382330518483068Subject:Project management
Abstract/Summary:PDF Full Text Request
The project schedule planning and control is the general process that planning,implementation,inspection,investigation and so on a series of activities.And the schedule planning and control is the top priority for the aircraft route maintenance project,must strengthen the management of project schedule planning and control.The thesis takes the large aircraft route maintenance project as the research background,analyzes the background of the large aircraft route maintenance project and the current problems faced by the project.Use project management related theoretical knowledge,establish the work breakdown structure,determine the order of the project and the duration of the activities,through the introduction of project management support software,compile large aircraft route maintenance project schedule.With the help of project management support software,the project duration is compressed to meet the needs of customers.Optimize the resources needed for large aircraft in route maintenance process,making rational use of resources.Make a tracking of the project process and adjust the deviation of the process,make sure the whole project schedule proceed smoothly.The conclusion of this thesis has some practical significance for the planning and control management of passenger aircraft route maintenance project and related projects.
Keywords/Search Tags:Project Management, Schedule planning, Schedule control
PDF Full Text Request
Related items