Font Size: a A A

Research On Refined Management Of The Whole Construction Process Of Aluminium Alloy Formwork

Posted on:2020-08-11Degree:MasterType:Thesis
Country:ChinaCandidate:J Q HeFull Text:PDF
GTID:2392330620458319Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,with the rapid development of China's economy,the material living standard has also been significantly improved,and people's pursuit of living environment and building quality is also constantly improving.At the same time,the state is vigorously promoting the concept of sustainable development of green building and promoting the recycling of resources,and has formulated relevant laws and regulations.Therefore,the construction industry is constantly looking for new breakthrough points under the environment of urgent need to meet the new needs of the society.How to improve the quality of construction products,how to speed up the construction cycle,how to effectively reduce costs,how to enhance the competitiveness of enterprises are the major challenges facing the current construction industry.In order to solve the above problems,various new materials,technologies and processes have been developed in the industry to realize green construction.In recent years,a new technology developed rapidly is aluminum alloy formwork.As a new formwork technology,it has been applied in many projects at home and abroad.However,due to the short time of promotion and implementation of aluminum alloy building formwork in China,there are few relevant national and industrial standards;as a result,people fail to fully understand the comprehensive value of aluminum alloy formwork,and they do not fully understand the construction process of aluminum alloy formwork,especially the lack of refined management standards in the construction process management.Therefore,this paper focuses on the fine management of the whole process of aluminum alloy formwork construction.Firstly,the development process and trend of the current common formwork project are described.Combined with the development status of aluminum alloy formwork at home and abroad,through detailed analysis and comparison of the characteristics of the current common formwork and aluminum alloy formwork,it is concluded that aluminum alloy formwork has the advantages of light material,convenient construction,installation and removal Secondly,through the study of the relevant theories and implementation points of fine management,it is concluded that fine management can effectively reduce the losses,improve the work efficiency and improve the quality effect,so as to determine the goal and implementation method of fine management in the whole process of aluminum alloy formwork construction.On this basis,the whole process of aluminum alloy formwork construction is constructed Fine management system,including safety,quality,construction period,cost and other aspects.According to the proposed fine management system,the implementation methods and rules of fine management in the whole process of aluminum alloy formwork construction(design and deepening stage,production stage,construction stage and evaluation stage)are systematically studied and discussed.Finally,combined with typical engineering cases,the proposed fine management system is verified The refined management method and system of the whole process of aluminum alloy formwork construction have the comprehensive value of improving quality,shortening construction period,reducing cost and environmental protection.
Keywords/Search Tags:Aluminum alloy formwork, Construction, Refined management, Comprehensive value
PDF Full Text Request
Related items