Research On The Progress Management Of The Construction Project Of W Reservoir's Flood Control Communication Early Warning System

Posted on:2019-08-26Degree:MasterType:Thesis
Country:ChinaCandidate:W ChuFull Text:PDF
GTID:2432330572965292Subject:Project management
Abstract/Summary:PDF Full Text Request
With the advent of the era of digital information,high-tech products are increasing and improving.In order to improve and improve the production and management level and improve the competitiveness of their own industries,all walks of life are striving to adopt mature and perfect high-tech products.This dissertation takes W reservoir flood control communication early warning system construction as the research object,makes full use of the project schedule and some theoretical knowledge of management,and studies the progress management of this project.This dissertation mainly manages the construction project of W reservoir flood control and communication early-warning system by using some theoretical knowledge of project schedule management.The project schedule is analyzed by key line method,network schedule planning technology,resource balance technology and key chain technology,Gantt chart,milestone map,critical path method and other commonly used schedule management tools and methods to control the progress of the project implementation process based on the analysis results to adjust the progress of the project to ensure that within a given time frame,in a limited Resources,the successful completion of the project.This paper provides a reference for the progress management of W reservoir flood control communication early warning system construction project.
Keywords/Search Tags:Project Schedule Management, Network scheduling technology, Critical Path Method
PDF Full Text Request
Related items