Research On Progress Planning And Control Of Gaodong Expressway Project

Posted on:2022-09-23Degree:MasterType:Thesis
Country:ChinaCandidate:J X FengFull Text:PDF
GTID:2492306317490624Subject:Master of Engineering Management
Abstract/Summary:PDF Full Text Request
With the rapid development of expressways in my country and the rapid formation of transportation networks,expressway construction has become a necessary part of economic development.Therefore,the requirements for express way construction projects are gradually increasing,and the development of schedules in expressway construction And control is particularly important.The correctness of schedule planning and control can not only determine the success or failure of project construction,but also affect the market development prospects of the project and the economic and social benefits it brings.Therefore,in a highway construction project that uses the content of the project schedule and management,not only can a reasonable construction plan be formu-lated under the premise of certain human,financial,and material conditions,but also for the timely and efficient construction of the project and the improvement of the management level of the construction unit It is of great significance.This paper uses the "High East Expressway Engineering Construction Project" as the research object,based on a series of processes of its investment,mainly discusses the preparation of the high-east expressway from the progress plan to the network map and the optimization of the progress plan And the control of the schedule,by taking effective measures,the progress plan of all the phases of the project will be described,first describe the specific content of the project,then work decompose the project,plot the work breakthrough map of the project,then please Experts have the corresponding resource demand estimation of the project,formulating a progress plan on the basis of project estimation,and uses the network plan using the method of the network diagram,and determines the critical route,and then surround all the processes of the project construction around the key route.The arrangement,and the project schedule makes more complete adjustments,thereby increasing the construction efficiency of the project,which compresses the compression period of the corresponding fees,so that the actual construction period of the project can meet the requirements of the contract side,and finally for the entire project It is possible to successfully follow the requirements of the contract,and the corresponding safeguards will be taken to optimize and adjust according to their variability.Under the premise of strengthening the protection measures,the project can fully meet the quality requirements while the plan can be completed within a reasonable period of time.the goal.This paper plays a certain reference and reference for the control of high-speed road progress.
Keywords/Search Tags:Project management, schedule management, Project planning and control, Highway construction
PDF Full Text Request
Related items