Font Size: a A A

Research On The Construction Of Risk Assessment Index Of "Colorful Yunnan" Granfondo Cycling Festival

Posted on:2024-04-18Degree:MasterType:Thesis
Country:ChinaCandidate:C H ChenFull Text:PDF
GTID:2557307121478714Subject:Physical Education and Training
Abstract/Summary:PDF Full Text Request
Since the introduction of the concept of national fitness,the scale of various mass events in China has been expanding,and the number of them has shown a blowout growth,but the potential risks behind the development of the events also follow.Due to the value interests of the event itself,while all kinds of events continue to appear,organizations that tend to benefit hear the news,and various problems such as lack of experience and improper organization of the event keep growing.The news of frequent accidents of the event is flooded in all major news headlines,which has aroused great attention of the society.Since its inception in 2014,the "Colorful Yunnan" Granfondo Cycling Festival has been running for nine consecutive years,but there are still many accidents during the event.Of course,this is not only the case of this event,but all competitions are accompanied by risks.In the background of today’s national sports,how to prevent and avoid risks and promote the development of mass sports is a topic worth discussing and studying.Based on this,this study choose "colorful Yunnan" outdoor cycling for the investigation object,plans to build a set of risk assessment index system for the event,comprehensive and system of the event risk assessment,for other outdoor cycling and other outdoor mass events more stable and harmonious development provide theoretical reference and evaluation index system model.This paper takes the risk assessment index system of "Colorful Yunnan" Granfondo Cycling Festival as the research object.first,Using literature data,field research and expert interview,On the basis of following the risk management,With the WSR system methodology as the theoretical support of the index division,The three dimensions of "physics-matter-human principle" are taken as the first index of the index system,Initially constructed the colorful Yunnan " Granfondo International Cycling Festival event risk assessment index framework system,And according to the characteristics of the first layer of indicators combined with the characteristics of the event to classify the lower indicators;next,Using the Delphi method to determine the risk indicators of the Granfondo International Cycling Festival through two rounds of expert questionnaire consultation,Constructing the hierarchical structure model of the event risk assessment index;While using the list-sorting method,Asassign value from three aspects of possibility,severity and controllability,Calculate the risk amount of each indicator;last,Using the tomographic analysis method to calculate the index weight of each layer,Finally,the following conclusions will follow: First,Using literature data,field research and expert interview,On the basis of following the risk management,With the WSR system methodology as the theoretical support of the index division,The three dimensions of " physics-matter-human principle " are taken as the first index of the index system,Initially constructed the colorful Yunnan " Granfondo International Cycling Festival event risk assessment index framework system,And according to the characteristics of the first layer of indicators combined with the characteristics of the event to classify the lower indicators;next,Using the Delphi method to determine the risk indicators of the Granfondo International Cycling Festival through two rounds of expert questionnaire consultation,Constructing the hierarchical structure model of the event risk assessment index;While using the list-sorting method,Asassign value from three aspects of possibility,severity and controllability,Calculate the risk amount of each indicator;last,Using the tomographic analysis method to calculate the index weight of each layer,Finally,the following conclusions are drawn:(1)through the initial stage.
Keywords/Search Tags:sports events, risk assessment, construction of index system, outdoor bicycle
PDF Full Text Request
Related items