Font Size: a A A

Design And Realization Of TIS2004 Management Information System Of Substation

Posted on:2007-11-27Degree:MasterType:Thesis
Country:ChinaCandidate:L ChenFull Text:PDF
GTID:2132360212960365Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
With the further promotion of the reform in electric power industry and development in market and information domain, the traditional electric power system management style has been already difficult to meet the production needs of enterprises.A lot of drawbacks exist in traditional operation management of substation, which embodies in: the producer's heavy task while low efficiency, the reasonless production management etc. Fortunately, the development of the computer technology has offered the scheme for solving these problems.For the reason above, utilizing the computer technology to develop the management information system with intelligence, saving and coming out staff in heavy labor, improving efficiency become a very urgent and meaningful work.As a major part of the integrated and automatic control system of substation, management information system commonly works with monitoring system to make it run. In 2002, Microsoft put forward the .NET platform, which has the ability to be a technical platform for the development of management information system in web model. According to the needs of the power-production enterprise, this article expatiate the designs of the management information system based on the NET technology in both C/S and B/S models. The system has worked at Chengdu Jinniu power supply bureau as a trial. So far, it makes a remarkable effect.This article depicts the functional demands of the management information system. Then depicts the construction and management of our Power system. Depending on this, it designs an overall scheme of the system based on .NET technological platform. The function of the management information system includes the following several aspects:(1)Deal with the data produced by the own system(2)Receive the real-time data from the monitoring system of substation(3)Make reports by using the data of system(4)Connect with the management information network of power bureauThen we analyses the order and the technological platform of this information system, yet the developing tools. In addition, this article analyses and solves the design of database; this part includes 3 kinds...
Keywords/Search Tags:Operation management of substation, .NET platform, B/S and C/S model, Crystal-Report
PDF Full Text Request
Related items