Font Size: a A A

The Compilation And Construction Of Shenyang Power Supply Company Substation Integrated Automation Construction Reform Planning

Posted on:2011-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y J XiaFull Text:PDF
GTID:2132360305457190Subject:Project management
Abstract/Summary:PDF Full Text Request
《The compilation and construction of Shenyang power supply company substation integrated automation construction reform planning》is based on Liaoning electric power company limited about the unmanned substation construction renovation's work requirements for formulating a project management.Electric power enterprises as a national economic foundation, must adhere to the "safety first and prevention first" principle. Shenyang power supply company follows the principle, the goal is to control not happening serious accident of power, death and wrong operation, major equipment accidents and all important users who have the responsibility blackout accidents, all kinds of accidents must comply with the requirements; The grassroots units must control the common accidents, obstacles and minor injuries; Team control abnormal and failed. The safety objects reflect " stepping responsibility, stepping control" requirements, through the stepping control and responsibility implementation to achieve preventing accidents overall objectives.The company leaders in the company Twenty-first five workers representative conference, definitely put forward overall strengthening grid construction, and work hard to strengthen substation integrated automation construction reform work. Through promoting the level of grid technology and equipment, can be better advance the company's overall competitive strength and realize sustainable development, promote the company's development to a new level. Company requires the substation system all cadres and workers pay high attention, cheer up, hard work, play the construction reform combat of substation integrated automation.In recent years, with the central call of revitalizing the old northeast and BoHai economic circle planning and implementation, the economy of liaoning especially shenyang's rapid development, the demand for electricity increasing, the input of power grid construction increasing. Especially the starting of intelligent building ultra-high voltage grid, currently shenyang newly-constructed substations is increasing exponentially, substation operation personnel shortages greatly, in the next few years, the contradiction of substation operation personnel shortages will more and more outstanding. To reform the substation integrated automation and unmanned, centralized monitoring, using the unmanned substation is the trend of power development and operation management, therefore, strengthen construction of substation integrated automation of Shenyang area is imperative.Currently Shenyang power supply company substation computer monitoring system and the microcomputer protection have been mature and wide application, new and reform substation all using integrated automation equipment, realizing computer monitor. Part of foreign power company has started large-scale 500kV and above of voltage level implement the unmanned and centralized monitoring reform work of substation integrated automation.This article has some reference at home and abroad, about the unmanned substation integrated automation construction and reform of forms, from which absorb some advantages. According to substations set control center and operation team management mode basic principles, analyze Shenyang 220kV and 66kV substation integrated automation construction realizing the unmanned substation. Through the investigation, analysis and comparison, using the methods of project plan management and control, responsibility distribution matrix, control chart etc related knowledge complete the project plan of"The compilation and implementation of Shenyang power supply company substation integrated automation construction reform planning".This paper first introduces Shenyang power supply company profiles, the basic concept of substation integrated automation system and unmanned substations , and analyzed the current condition of substation in shenyang, discusses the objective factors, management pattern, contents and requirements of implementing substation integrated automation to unmanned substations, formulate rational construction and reform's overall planning and implementation scheme of substation integrated automation, at the same time, investment estimate and risk analysis, and implementation with planning. Through the Shenyang power supply company of substation integrated automation construction and reform, thus greatly enhancing the health level of equipment, and promoting the ability of equipment against external damage and natural disasters, and at the same time, promoting production management mode transforming to more scientific and humanistic. So only by constantly strengthen shenyang power grid construction, people's life safety that to meet the demand.
Keywords/Search Tags:Substation, Integrated automation, ReformPlanning, Compilation and construction
PDF Full Text Request