Font Size: a A A

Study On Owner Adminstration On Planing & Design Of Submergence Disposal & Resettlement For Baise Reservoir

Posted on:2006-11-05Degree:MasterType:Thesis
Country:ChinaCandidate:S DengFull Text:PDF
GTID:2166360152994321Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The analysises and studies on owner adminstration on planing and design of submergence disposal & resettlement for Baise Reservoir are included in this paper. Based on the problem and experience on the Baise project, the author brings forward the necessary and the keystones of the deseign outline. Aimed at the imbalance of the compensation and resettlement standards between two provinces on Baise Reservoir, this article analyse and adjust the standars to balance on the whole. In order to settle the inconsistency between the present land law adminstration and regulation on acquired-land compensation & resettlement resulted from large- & medium-scale hydropower project, temporary control standards of acquired-land compensation are advanced for Baise Reservoir. The author calculate the taxes and fees, such as infield occupancy tax, forest vegetation ersume fee, infield reclamation fee and acquired-land adminstration fee, which should be contained in the adjustment budgetary estimate. This paper make a adjustment budgetary estimate forecast of submergence sisposal and sesettlement for Baise Reservoir ,basing on the new regulation on acquired-land ocmpensation & resettlement resulted from large- & medium-scale hydropower project and the deseign alteration in practice.
Keywords/Search Tags:Baise Reservoir, resettlement, deseign adminstration, outline, standard, tax and fee, budgetary estimate
PDF Full Text Request
Related items