Font Size: a A A

Chung-hing, Electric Stove Company Of Shaanxi Heavy Machinery Plant Project Management System

Posted on:2004-01-09Degree:MasterType:Thesis
Country:ChinaCandidate:K TangFull Text:PDF
GTID:2206360125452064Subject:Business Administration
Abstract/Summary:PDF Full Text Request
The Project Management had been developed after the World WarII happened. It, which was named "plan as a whole" in that time, was introduced to our China in 1960s, and was applied to different parts of national economy. Some organization will apply management theory to the running project consciously or unconsciously. This paper elaborates the definition and characteristic of Project Management on theories. Such as complexity, creativity, lifecycle of the projects, the importance and successful signification of Project Management. It describes what are the benefits and problems when Shannxi heavy machinery factory arc furnace corp. operated the Project Management, and stresses on analyzing the Multi-rank Project Management System, authority system, course model, experience accumulation, and function of manager of this firm, it discusses that how to use it as reference. According to their experience, it will give some advise to traditional manufactured enterprise by analyzing the configuration and operating process of advantages and disadvantages. It analyzes the challenge of domestic manufacturing enterprise and characteristics of equip manufacture enterprise in order to bring forward to some advice about form rebuild, and erect mixmatrix management organization.
Keywords/Search Tags:Project management, system, use as reference
PDF Full Text Request
Related items