Suzhou Science And Technology Building Project Schedule Control

Posted on:2012-02-02Degree:MasterType:Thesis
Country:ChinaCandidate:L M DaiFull Text:PDF
GTID:2212330371459874Subject:Project management
Abstract/Summary:PDF Full Text Request
Suzhou Science and Technology Building project is a comprehensive office building, which is twenty-six floors on the ground, and two floors in the underground. The building's construction areas are about 113000 square meters, and it cost 10 millions Yuan. It is a complex project which is included curtain wall, refined decoration, electroweak, and so on. In recent years, large office building projects have a high developing speed, and follows construction period is short, and the control demanding of progress plan is high. This article's purpose is to provide the advice about constructing a comprehensive office building in the future.Based on this background, the article research the modern project management theory, and analysis schedule planning and control methods for Suzhou building construction. Using of the relevant project management knowledge, and taking Suzhou science and technology mansion project as an example, the paper elaborate the project schedule planning, principle and methods in Suzhou science and technology building construction.This paper is mainly divided into five parts:Firstly, the paper discusses the project schedule planning, control theories and methods. The project schedule planning and control methods are discussed systematically in this part. Secondly, the paper introduced Suzhou science and technology building project, and elaborate the general condition of the project, organization, progress, contract content, and so on. Thirdly, the paper expounds how to use the theory to make a planning which is included task decomposition, determining working process, and estimating the project master schedule according to the project activity time. In the forth part, according to the project schedule control theory, the paper discussed affecting the schedule factors in the project implementation process. At the same time, the paper gives the solution for matching the time limit for the project. Finally, the paper gives a summary, and propounds the research direction in the future.
Keywords/Search Tags:Project Management, Scheduling, Schedule Control, Office Building
PDF Full Text Request
Related items