Font Size: a A A

The Study On Compiling The Budget Quota Of Highway Maintenance And Processing Method Of The Raw Data

Posted on:2013-11-15Degree:MasterType:Thesis
Country:ChinaCandidate:Z LiuFull Text:PDF
GTID:2232330392959016Subject:Road and Railway Engineering
Abstract/Summary:PDF Full Text Request
On the basis of ensure the quality and the service level of highway maintenance,establishing and improving the budget quota of highway maintenance project is theproblem that the current highway maintenance management departments need tostudy and solve,and it has important significance of improving the highwaymaintenance technology and the management level of cost,and it also has importantsignificance of promoting freeway conserve system reform and perfecting freewayconserve commercializes.This paper takes highway maintenance engineering of Inner Mongolia as theresearch object,investigating and collecting domestic and foreign research data,through to the analysis of the characteristics of the highway maintenance projects,applying the basic principle and theory of the budget quota of highway maintenanceto determine the calculation program and the method and the form of the basic datasurvey,and in terms of weekday realistically method as the main method to calculateand survey field data.Sorting out and analyzing the survey data,using the improvedGrubbs’ criterion to eliminate the abnormal data,and the paper summarizes to thecalculation method of the maintenance budget ration respectively to measure data andthe provinces survey data as the primary data,the former has the average energymethod and the weighted average amount of the convergence method,and the latterhas the gray system theory and the fuzzy analogy method.Finally,though variousmethods to determine the maintenance budget quota and use the actual engineering tovalidate the quota.Various examples prove the original data processing method in the differentsituation is practical and feasible,and the expressway maintenance budget quotaaccord with the actual engineering checking of the specific conditions of the InnerMongolia autonomous region....
Keywords/Search Tags:budget quota of highway maintenance, improved Grubbs’ criterion, average energymethod, fuzzy analogy method
PDF Full Text Request
Related items