Font Size: a A A

The Government Supervision Mode In Middle School&Primary School Expansion Project

Posted on:2014-10-29Degree:MasterType:Thesis
Country:ChinaCandidate:M W LiFull Text:PDF
GTID:2252330425975941Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Education in today’s economic and social development and national revitalization,guiding, basic characteristics and global status. With in-depth development of economicglobalization today, the rapid progress in science and technology and increasingly fierceinternational competition, more and more knowledge is defined as the decisive factor toimprove comprehensive national strength and international competitiveness. And talentresources is more and more as a strategy to promote the development of economic andsocial resources, status and role of education is more outstanding. Education is not onlythe development of science and technology and cultivating talents on the basis ofengineering, but also improve the ideological and moral qualities and scientific andcultural qualities of basic way. The Chinese government has always attached greatimportance to education investment in education career, work, improve the campushardware construction, is the good condition of school education.Luogang district in recent years, the reconstruction of primary and secondary schoolswith a total investment of nearly1.5billion yuan, but there is a school distribution isuneven, there is still a gap, total lack of management, has the problem such as relationshipis unknown, this article through to the domestic and foreign government investmentconstruction project management of related summary and analysis on the practicalexperience, on the basis of comparative analysis, in combination with the practicalsituation of Luogang district, in guangzhou city. Eighty-three middle school reconstructionproject as an example, in-depth analysis of Luogang district government investmentconstruction project management mode, the Luogang district government investment ofconstruction project management process and content, including construction projectquality management, project construction time limit for a project management, projectconstruction cost management, project construction contract management, projectconstruction safety management are analyzed, and found the Luogang district projects ofgovernment investment projects management of primary and secondary schools, defects and problems specific such as: duration control is not strict, part of the project delays,almost without finish on time. Construction project cost management is not perfect,optional the gender is strong, early decision stage, project investment budget investmentreview become a mere formality, site construction process change the visa and the projectquality management more lack of unified standards, etc. So proposal shall be the Luogangdistrict projects of primary and secondary schools to set up the infrastructure constructionof primary and secondary schools management standard, besides, still should strengthenthe construction of the project cost management and progress management,strengthening design management and professional management of governmentdepartments and the owner, the practical implementation of agent construction projectsand further strengthen the audit supervision, etc, to further improve Luogang districtgovernment investment construction projects of primary and secondary schools thegovernment regulatory system.
Keywords/Search Tags:government investment, reconstruction of primary and secondary schools, projectmanagement and supervision
PDF Full Text Request
Related items