Font Size: a A A

Third-party Checking System Of Construction Projects Based On Government Procurement

Posted on:2016-12-11Degree:MasterType:Thesis
Country:ChinaCandidate:B XuFull Text:PDF
GTID:2279330485479919Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Construction projects of government procurement are usually public works or infrastructure projects, which have large scale of investment and take a long time. In order to ensure the construction quality, the government needs a team of experts to carry out independent and impartial examination in the whole construction process. Hence, the third-party checking services to construction projects could be purchased. Based on the definition of government procurement, the thesis established the third-party checking system and introduced it into practice.Firstly, relevant provisions of the relevant laws and regulations about the government procurement services are analyzed. Considering the characteristics of the third-party service of construction projects, range of the purchase subjects and the undertaking subject is divided. Then the means of using bidding method to purchase the expert service is proposed. The legal supervision, administrative supervision, social supervision mechanisms and the problem of how to evaluate the service performance are also explored.The third-party checking service of construction projects is defined. Namely, it is a kind of engineering consulting services, which checks the behaviors and construction qualities of the main parties involved in the pre-planning stage, the design stage and the construction stage respectively. Thereby the service could provide decision-making support for the project investor and help to achieve the total control objectives. The checking object, purposes, contents, methods and organization structures are also clarified.Finally, the third party checking service of government procurement construction projects commissioned by an administrative department to a project testing company is taken for an example. It is carried out during the construction process. Based on this example, the quality behavior of responsibility subjects such as constructors, supervisors and the quality testing results are analyzed. Then improving measures are brought out to ensure the smooth complete of the construction project.
Keywords/Search Tags:Government procurement, construction project, the third-party checking service
PDF Full Text Request
Related items