Font Size: a A A

The Selecting And Appointing Cadres"Tui You Yu Cai" With Project Quality Management In Nanning

Posted on:2014-02-16Degree:MasterType:Thesis
Country:ChinaCandidate:W LiangFull Text:PDF
GTID:2296330431484912Subject:Project management
Abstract/Summary:PDF Full Text Request
The report of the18th national congress of cpc clearly defined the objective of "comprehensively improve the scientific level of party building". The Organization Department of the CPC Nanning Municipal Committee tightly around the18th report spirit, Presenting a new scientific organization construction climax, also put forward the scientific requirements on cadres,, according to the actual work in Nanning City. The advanced management mode which appropriate work needs was introducted In the cadres of the cadre of cadre management and allocation,improving the management efficiency and scientific level, such as the attempt to apply the project management in Nanning city "Tui You YU Cai" project, It’s explores a new way to improve the scientific level of Nanning city organization work.In this paper, The " Tui You YU Cai" of the project quality control problem was studied with the application of quality management theory and method of project management in Nanning,The full text is divided into six parts, t the research background and significance was introduced in the first part.,The Nanning city cadre selection and appointment was introduce in the second part. the summary of Nanning city " Tui You YU Cai" project was introduced in the third part,In the fourth part, the influence of Nanning city " Tui You YU Cai" project quality factors are studied. the factors which affecting the nanning " Tui You YU Cai" in directing project quality was analyzed and studied,The quality control theory and method in the management of project quality management by the fifth part, In the fourth par, the quality control measures of Nanning city " Tui You YU Cai" project was studied with the quality control theory and method in the management of project quality management. The sixth part is the conclusion and Prospect.
Keywords/Search Tags:Nanning City, the selection and appointment of cadres, "Tuiyou Yucai" project, quality management, the Scientific
PDF Full Text Request
Related items