Font Size: a A A

Risk Assessment Of The Logistics Park Construction Project In Yuncheng

Posted on:2015-09-28Degree:MasterType:Thesis
Country:ChinaCandidate:Y M LiFull Text:PDF
GTID:2309330473950000Subject:Project management
Abstract/Summary:PDF Full Text Request
In this paper, combing the International Risk Management Research domestic project status, basic overview of project risk management theory, considering the risk management status Yuncheng coal chemical logistics park construction projects, especially in relatively backward areas of factors influence policy, based on the work table method to identify the Yuncheng coal chemical logistics park construction project risk, and the use of fuzzy comprehensive evaluation method of Yuncheng coal Chemical logistics Park, a comprehensive assessment of project risks, according to the results of a comprehensive assessment of environmental risk large industrial policy results presented Yuncheng coal Chemical logistics Park project risk prevention, risk sharing and risk reduction measures. Specific research framework follows.Firstly, for the theory of logistics park construction project risk assessment systematically combed, summarizes the research status quo at home and abroad about the logistics park construction project risk assessment for the logistics park construction project risk assessment and lay a solid theoretical foundation. This paper theoretical research projects on risk assessment carried out logistics park system in order, provide a reference for similar research projects.Secondly, this paper constructed coal chemical logistics park project risk assessment system. Conduct analysis of all aspects of Yuncheng coal chemical logistics park construction project, risk factor analysis to identify the existence of the project, explain the structural model was constructed using the index system Yuncheng coal chemical logistics park construction project risk assessment to determine the six secondary indicators and 19 three indicators, again using AHP method on the basis of various indicators of empowerment,Finally, this paper Yuncheng coal chemical logistics park construction project risk assessment and recommendations put forward countermeasures risk prevention. The planning phase and the operational management of risk factors at different stages of proposed risk management measures, the planning stage, the actual logistics from the local needs, to develop practical business planning, development of enterprise risk management regulations, the establishment of risk management department, setting risk management information systems, scientific and effective risk management and control, and related insurance coverage, the potential losses to a minimum. At the same time, we must continue to improve the quality of personnel and service quality.
Keywords/Search Tags:Logistics Park Construction Project, Risk factor, Risk Management
PDF Full Text Request
Related items