Research On Progress Management Of Jiangnan Park Construction Project In Nanning

Posted on:2018-02-18Degree:MasterType:Thesis
Country:ChinaCandidate:J J LiaoFull Text:PDF
GTID:2322330542964555Subject:Engineering
Abstract/Summary:PDF Full Text Request
The progress management is the key factor of project construction management,and the perfect progress management can ensure the smooth implementation of the project.Currently in garden using project management method in engineering industry is less,the construction management model of a single,extensive management measures,how to improve the level of the project schedule management has become the garden engineering urgent problems to be solved.The construction of jiangnan park construction project is extensive and the construction period is long,and the project duration and quality are high.After the construction of the project,the project department organization is not perfect,lack of management personnel,construction organization design is not reasonable,the construction schedule is too simple,disorderly,on-site construction management project overall construction progress is slow.This article through to the jiangnan park construction present situation analysis,find out the internal and external factors influencing the construction schedule,and puts forward the solution:use of project management methods improve the contractors organization structure,personnel and organization and management measures are put forward,using the network plan to jiangnan park construction project progress plan formulation optimization,horizontal comparison method,S curve comparison method is used to analyze the project schedule and put forward solutions,from the overall project organization,economy,technology,contract and information security measures,such as all-round safeguard project progress smoothly.In this paper,by using the Internet in the jiangnan park construction project planning laws,schedule analysis and rectification project management methods,such as inspection,in order to improve the present situation of the project progress is slow,and gradually formed a set of effective botanical garden construction schedule management mode,as the reference of the other landscape construction mode for promotion use.
Keywords/Search Tags:project schedule management, network plan, deviation analysis and correction measures
PDF Full Text Request
Related items