Risk Management Study Of 30000t/a LiOH Construction Project Of A Company

Posted on:2022-03-06Degree:MasterType:Thesis
Country:ChinaCandidate:J K ShengFull Text:PDF
GTID:2491306311465144Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of the new-energy automobile industry,the demand for new materials of chemical products related to the lithium battery industry has increased sharply.Lithium hydroxide is an excellent raw material for lithium batteries which has shown a trend of rapid development in recent years.However,the construction and operation of the chemical industry involves multiple links and multiple departments,and there may be risk factors in flow of capital,goods and people.Our country’s risk management for the chemical industry started late and has a poor foundation,especially for medium and large-scale fine chemical projects,which often rely on empirical judgments for risk management,and lack scientific management basis.Therefore,this paper conducts risk identification,evaluation and response to the 30,000-ton lithium hydroxide construction project of Company A,and establishes a risk management system for lithium hydroxide production and construction projects,which provides a theoretical basis for the risk management of new materials and chemicals.It also has certain reference significance for other fine chemical projects.This paper analyzes the current research status of lithium hydroxide at home and abroad,and under the current progress,the risk management plan of the company’s new project is carried out.It also conducts risk identification on lithium hydroxide production and construction projects through brainstorming,checklist and Delphi methods.The main risks involved in the project are identified as market risk,technical risk,HSE risk,quality risk,cost risk,capital risk and schedule risk.Furthermore,the AHP method was used to carry out a quantitative risk evaluation of the project.According to the evaluation results,it is concluded that the most important risk factor is HSE risk.Its risk evaluation value is significantly higher than other risks.Other main risks are cost risk,schedule risk and technical risk.Quality risk,capital risk and market risk are relatively small.Finally,according to the results of risk identification and evaluation,specific risk response measures are proposed for each risk factor.
Keywords/Search Tags:Lithium hydroxide, Risk identification, Risk assessment, AHP method, Risk response
PDF Full Text Request
Related items