Font Size: a A A

The Research Of Post Occupancy Evaluation Of Built Environment

Posted on:2009-09-14Degree:MasterType:Thesis
Country:ChinaCandidate:S LiFull Text:PDF
GTID:2132330332977825Subject:Urban planning and design
Abstract/Summary:PDF Full Text Request
In this thesis, on the basis of the foreign and internal theory of post occupancy evaluation, hope to explore a set of conditions for China's post occupancy evaluation procedures and methods. Answer to comment on the initial conditions in today's China under the post occupancy evaluation of the problem. At present, post occupancy evaluation of the technology in general can be divided into technical feedback and feed-forward techniques. Feedback technology, including the construction of a comprehensive evaluation of the performance, as well as data sharing;Feedforward technology focused on the use of feedback information from the management or policy decision, building construction to improve the process of decision-making efficiency.This thesis is divided into three parts:The first part of the theory for the articles, that is, on-the theoretical research of the post occupancy evaluation of built environment. The thesis describes the purpose of the study, the target of significance, methods; introduced into the environment, the post occupancy evaluation of the basic concepts, and the post occupancy evaluation at home and abroad, production, the development process; Point out the procedures and data collection methods of the post occupancy evaluation of built environment. This section includes the first chapter, Chapterâ…¡,â…¢andâ…£.The second chapter is divided into practice, that is, the next-into the post occupancy evaluation of built environment of case studies-to Lijiang Shuhe as an example. To the ancient town of Lijiang Shuhe to the target practice, the beam from the ancient town of Shuhe Zone supporting the early stage of planning, design, to the post occupancy evaluation, according to the theory of planned articles in the evaluation process, the orderly conduct of the overall evaluation investigation, analysis and summing up the work.This section includes Chapterâ…¤,â…¥,â…¦andâ…§.Sum into the third. By the theory and practice of finishing the process accumulated in the entire thesis as a whole had a retrospect and prospect. This section includes Chapterâ…¨.
Keywords/Search Tags:Built Environment, Post Occupancy Evaluation, LiJiang, ShuHe
PDF Full Text Request
Related items