Font Size: a A A

Study On Local Adjustment Of General Land Use Planning

Posted on:2012-06-17Degree:MasterType:Thesis
Country:ChinaCandidate:X J ZhuFull Text:PDF
GTID:2189330332989005Subject:Public Management
Abstract/Summary:PDF Full Text Request
Papers by on Heilongjiang farm near 5 years (2005-2009) land using planning adjustment actual work of in-depth understanding, on master of during Foundation data for has classification statistics and summary analysis, from Heilongjiang farm land using planning various type project of adjustment and the several practice encountered of non-project of adjustment situation for explained, to combination typical adjustment case schematic analysis, from positive reflect has national project, and provincial project, and post-registration procedures project of generation said cases of adjustment planning situation, came implementation land using overall planning of actual work in the, planning constantly encountered adjustment problem of regularity, is land using overall planning on future development of uncertainty, and by macro policy of regulation effect, industry inputs large major project Foundation facilities of construction, cause planning adjustment frequency substantially rose of actual status. As a result of the differences between the types of land use and economic development, around the planning area and the adjustment of frequency varies. At the same time from branch based on the actual planning and adjustment of the farm, raise reason analysis, come to the basic problems of land-use planning and management and land-use planning and utilization of land resources has seriously does not meet the current development direction, frequent local adjustment has affected the construction structure layout, development planning, and caused some hindrance. Through the analysis of development trend of farm land planning and adjustment, new round land use planning to adjust the overall downward trend forecast, which is conducive to effective ways to reduce the adjustment of the planning. Listed farm in actual work in the on adjustment planning of supervision management program and planning adjustment principles, and on original planning adjustment in the of exists prepared early thought narrow, and on the construction consider enough comprehensive, and on national land policy grasp does not in place caused by, and basic farmland protection rate high and layout does not reasonable, and Foundation data does not accurate, and land using layout not reasonable, and planning adjustment randomness large, and the annual actual completed for to rate also to be improve, problem for analysis, summary planning adjustment by history stage, and timeliness, and the management implementation system does not perfect, limit of fundamental causes, turn made perfect land using planning adjustment management system of countermeasures, established more reasonable of of supervision system, from effect planning adjustment of inside and outside driven factors start, perfect of planning adjustment management measures: concept Shang change, and planning method means Shang constantly update, and management means Shang further perfect, and strengthening social stability risk assessment report prepared, from planning of implementation management of regulations, and administrative, and economic technology, system means for control, focus on related planning coordination convergence, play and manpower tube controlled role, from fundamentally reduced does not reasonable of planning adjustment.
Keywords/Search Tags:general land use planning, planning adjustment, objective analysis
PDF Full Text Request
Related items