Research On Schedule Control Of The Project For Harbin Ping Fang Automobile Assembly Industry Base

Posted on:2009-08-29Degree:MasterType:Thesis
Country:ChinaCandidate:R ChenFull Text:PDF
GTID:2189360272979764Subject:Project management
Abstract/Summary:PDF Full Text Request
Project schedule control is the foundation and key factor for the successful implement of a project. It has been a focusing issue in project management. Project schedule control is crucial to the timely significance of a project. In practical project management; schedule control theory has been widely applied and has played an important role. Schedule control theory forms a very important part in schedule control. The study on schedule control theory provides theoretical reference for enterprises in controlling project schedule effectively, and project cost and quality control is realized through project schedule control.Therefore, the relevant theories of progress control will be applied effectively to the project construction, and it can be used to guide the implementation of the project to ensure timely completion of the period.With the study on project schedule management theory, the paper made introduction of schedule control theory, its application method and is function in project management.This paper is targeted at "the Harbin Ping Fang Automobile Assembly Industry Base project", the content includes how to apply the project schedule control theories, methods and techniques to all aspects of the project schedule control practice, such as progress planning and implementation, giving full play for the project schedule control to resolving specific problems of the role of project operation.First, the paper introduced the schedule control theories, methods and the theories about project schedule of planning and implementation. Then it expounds the preparations for project schedule control of "the Harbin Ping Fang Automobile Assembly Industry Base", mainly on the project introduction, the decompounding of the project, the project organization structure and functions of the institution, and project control system installed.Next, the paper analyzes the specific process of the project schedule control, introducing the project control schedule scheme with the control procedures and methods. The paper expounded the schedule arrange and the schedule planning, and described the dynamic process of project schedule control, including progress reports, the error analysis and corrective measures.Finally, the paper evaluated synthetically the estimation index system of the construction process using the Analytical Hierarchy Process and the fuzzy comprehensive estimation of the fuzzy math. Explained the estimation process with the real project example of "the Harbin Ping Fang Automobile Assembly Industry Base project".We can supervise and control the action of the working units efficiently during the construction period by utilizing this estimation system.
Keywords/Search Tags:Assembly Industry Base, Project, Schedule Control
PDF Full Text Request
Related items