With the acceleration of the process of urban modernization, the demand for the construction of transportation facilities is increasing. The subway project involves engineering survey, geology, hydrology geology, cultural relic protection, environmental impact,underground space excavation and supporting structure design and construction, and many other disciplines, complex factors, coupled with the rock and soil medium and hydrological conditions of the variability, uncertainty and hidden underground engineering construction,which is more and more difficult. Therefore, the scientific management of the process in which subway construction is particularly important, in order to control from the source, the bidding of subway construction supervision and management of effective and complexity of the subway construction management research has important application value and significance.Analysis on Influencing Factors of subway construction management through the influencing factors of subway construction management are classified, on the basis of previous studies by using AHP analytic hierarchy process to calculate the weights of evaluation indexes at all levels, using the expert scoring method to determine various evaluation index of the corresponding level of membership, the fuzzy comprehensive evaluation vector and according to the principle of maximum membership degree, determine the evaluation index at all levels of the grade, and then find out the corresponding relationship between the subjective ability and objective complexity. The subjective and objective measure of model complexity index is applied in the practical engineering of subway construction based on established, prove that the model can be successfully applied to the subway construction bidding management, provide a reference for enterprise to undertake the subway project, and put forward to improve the enterprise subjective ability and objective complexity measures to reduce the subway project. |