Font Size: a A A

Research On The Progress Control Of The 104 National Road Link Project

Posted on:2018-09-05Degree:MasterType:Thesis
Country:ChinaCandidate:S G CuiFull Text:PDF
GTID:2322330569988971Subject:Business administration
Abstract/Summary:PDF Full Text Request
The construction of domestic infrastructure is changing with each passing day.In the process of project construction,the importance of project management is becoming more and more prominent.As the key content of China's infrastructure,improve the transportation infrastructure construction has its own features and implementation of highway engineering is such,such as linear distribution of highway construction is decided by its characteristics different from other infrastructure,more influence inevitably involved along,these effects will become the restricting factors of project management.Or a schedule control promoting factors.The speed of the project,whether the quality is in line with the drawings and specifications,how to ensure the engineering safety and how to control the cost effectively is an important part of project management.As an investment unit,how to achieve fast and good completion of the project,the key to achieve investment recovery and gain benefit.The progress management of the project is very important to the construction unit and the owner,especially as an investor,more attention is paid to the progress management of the project.In this paper,the progress of the project management as the main research object,through analysis and study of modified schedule management line engineering of Fujian province Fuzhou City 104 State Road,Lianjiang-Jinan,using the critical path method to analyze and guide the project schedule management,the implementation of real-time follow-up of the project,and through the control plan found deviation,aiming at finding problems and find out the causes and influencing factors,so as to analyze the correction,so as to ensure the progress of the implementation of the plan,and summarizes the corresponding project management method.A key issue for how to schedule the project management effect evaluation is also in the process of project management,this paper adopts the method of fuzzy analysis of the influence of various factors on the project implementation process of the comprehensive analysis,the changes of the construction phase of the influencing factors of weight value should change,this is the dynamic management,through the method of determining weight the dynamic coefficient is calculated by using the mathematical matrix,which is a scientific analysis and comprehensive evaluation of the project,but also provide a reference for future highway engineering project schedule management and comprehensive evaluation.
Keywords/Search Tags:Project management, Schedule management, Critical path method, Fuzzy analysis method, Influence factor
PDF Full Text Request
Related items