| The safety of drinking water in rural areas is concerned with the well-being of the people,the party and the government attach great importance to it,and the public is paying high attention to it.Since the implementation of rural drinking water safety project in 2005,a total of 19.96 million rural residents and 2.28 million rural schools in jiangxi province teachers and the students listed in the state plan,by the end of 2015,the province’s total investment 10.332 billion yuan,built more than 50000 rural drinking water safety engineering,complete the planning task.Rural drinking water safety engineering construction in jiangxi province fruitful,reduced the rural residents disease incidence,improve the living standards,improve the rural living environment,cities and counties in the area of unified management and rational use of water resources.The orderly implementation of the safe drinking water safety project in jiangxi province is due to the effective implementation of the policy.This article expounds the jiangxi province rural basic situation of rural drinking water safety work,organize the law related to the rural drinking water safety project,summarizes the classification of rural drinking water safety engineering major policy and related policies in jiangxi province,through to the jiangxi province a rural drinking water project planning analysis,the results from the policy formulation and implementation,funds management,project management and so on feedback policy landing situation in our province,summarizes the currently existing in our province rural drinking water safety project construction funds shortage,ensuring long-term operation,the project coordination is difficult problems,put forward to strengthen funds safeguard,the establishment of rural water supply project maintenance maintenance mechanism,strengthen the implementation of government responsibility,etc.By means of the implementation of the policy on the safety of drinking water safety in rural areas of the province,it is proposed to further implement the preferential policies and reduce the tax and fees.We will further strengthen the management of rural water supply,and establish market access and exit mechanisms for rural water supply projects.We will further improve the mechanism for the operation of the project and improve the legal construction. |