Font Size: a A A

Optimization Of Fire Prevention And Control System In Pudong New Area

Posted on:2018-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y GaoFull Text:PDF
GTID:2416330536975572Subject:Public administration
Abstract/Summary:PDF Full Text Request
At present,Pudong New Area is in a position based in Pudong to develop national strategy,the basic completion of the core area of four center and innovation center,the basic form of socialist modern international metropolis style,the key stage of the new urban formation with an open,multi-functional,modern characteristics,facing the development pattern of change rapidly,the Pudong New Area fire prevention and control work facing new opportunities and challenges.In the face of the current situation and tasks of fire real struggle and severe,combined with the main arguments and conclusions at home and abroad,the concept of fire fire prevention mode,fire prevention and control network,modern fire management mechanism,fire power system construction,discusses the basic concept of fire,fire,fire hazard and fire prevention and control system is defined,and in theory,system the theory of emergency management and public safety under the guidance of the theory,based on summarizing the practice,summary and combing the Pudong New Area fire prevention and control system for many years and the achievements of Pudong New Area,through the analysis of existing fire system such as the main responsibility for fire safety,fire safety consciousness lag,governance mode to deal with catastrophe emergency system and comprehensive ability an urgent need to strengthen the supply and demand of public products is not enough to balance the responsibility consciousness of fire Desalination,governance lag and other major issues,trying to control the fire safety concept is weak,"first development,governance" of the traditional mode of influence,funds and equipment control level is low,the prevention and control of simulation system and accountability mechanisms to enhance other aspects,in-depth excavation of the cause of the existence of Pudong New Area fire prevention and control system,and learn from the successful experience of developed countries such as Britain and Japan in terms of fire laws and regulations construction,management system design,guarantee mechanism,and tries to improve the fire safety responsibility system,strengthen the prevention and control knowledge publicity and education training,optimizing the prevention and control of organization structure,construction of hidden investigation mechanism,increasing public goods supply efforts,the implementation of fire drills crisis normalization six to explore the Countermeasures for optimizing the dimensions of Pudong New Area fire prevention and control system,try to outline the next time Pudong as a large city fire "road map",and strive to achieve the Pudong New Area fire prevention and control of "four in one"(the unified leadership of the government,departments,units responsible for the comprehensive supervision according to law,active participation of citizens)gradually to the "eight in one"(fire safety responsibility,the legal system of fire control,key control,education,social governance comprehensive security,emergency rescue,work assessment)change,in order to promote the district fire safety responsibility to implement and consolidate the basic fire safety area and speeding up the mega city fire governance systems and governance capacity modernization objective.
Keywords/Search Tags:Pudong New Area, fire prevention and control system, Problem, Optimization Suggestion
PDF Full Text Request
Related items